What problem does it solve?
After an initial ADU permit submission is rejected, contractors are left with a corrections letter and scattered research artifacts from preliminary analysis, but no professional, standardized response package to submit to the building department. Manually compiling the required response letter, scope of work, and plan annotations is time-consuming, error-prone, and often leads to further submission delays or additional rejections.
Core Features & Use Cases
This skill takes the output of the initial corrections analysis phase (categorized correction items, state and city code research, plan sheet observations) plus contractor-provided answers to plan checker questions, and generates four submission-ready deliverables: a formal response letter addressing every correction item, a detailed professional scope of work for design teams, a project status corrections report for tracking progress, and per-sheet annotations for plan revisions. It is used by ADU contractors and design professionals to fast-track permit resubmissions and reduce the average 6-month delay caused by bureaucratic correction cycles.
Quick Start
Use the adu-corrections-complete skill to generate a full, ready-to-submit response package for your ADU permit corrections using the analysis files and contractor answers saved in your project session directory.