aegis-customer-build

Automate customer-site builds from a configurator briefing through a 9-gate pipeline.

Updated Aug 23, 2026
One-click install
npx skills add https://github.com/RideMatch1/a.e.g.i.s --skill aegis-customer-build
Or copy as Structured Prompt for Agent
Please help me install this Agent Skill.
Skill: aegis-customer-build
Source: https://github.com/RideMatch1/a.e.g.i.s/tree/main/packages/skills/skills/foundation/aegis-native/aegis-customer-build
Command: npx skills add https://github.com/RideMatch1/a.e.g.i.s --skill aegis-customer-build

SYSTEM DOCUMENTATION & REQUIREMENTS

💡 This Skill includes references (resource) components.

What problem does it solve?

Autonomous, end-to-end construction of production-ready customer-website projects driven by a configurator briefing.

Core Features & Use Cases

  • Multi-phase pipeline (Pre-Build, Recon, Architecture, Build, Content, Integration, Mid-Audit, Final-Verify, Post-Build)
  • 100% briefing-coverage enforcement with phase-references and a 9-gate verification loop
  • Multi-agent orchestration (Master/Research/Executor/Strategist) and strict quality gates
  • Scripted references to library of components and project-specific references for deterministic builds

Quick Start

Ingest a briefing.md and run the autonomous customer-site build via the operator-initiated briefing path.

Frequently Asked Questions about aegis-customer-build

High-intent search queries and answers about installing and using this skill.

FAQPage Schema
How do I automate end-to-end production website builds from a briefing document?

Automate end-to-end production website builds by ingesting a briefing.md file to trigger an autonomous 9-gate pipeline. The pipeline executes Pre-Build, Recon, Architecture, Build, Content, Integration, Mid-Audit, Final-Verify, and Post-Build phases with multi-agent orchestration.

What is a multi-phase build pipeline with quality gates?

A multi-phase build pipeline with quality gates is a fixed 9-step construction process enforcing 100% briefing-coverage. It uses phase references, library binding, and state checkpoints across nine gates to ensure deterministic, production-ready customer-site builds.

How do I enforce 100% briefing-coverage during an automated site build?

Enforce 100% briefing-coverage by running a 9-gate verification loop with phase references and state checkpoints. The pipeline strictly validates that all configurator briefing requirements are met before advancing through the build phases.

Does multi-agent orchestration work for customer-site builds?

Multi-agent orchestration works for customer-site builds by deploying Master, Research, Executor, and Strategist agents. These agents coordinate across the 9-gate pipeline to apply scripted references and library bindings for deterministic results.

What's the best way to structure a configurator briefing for autonomous site generation?

Structure a configurator briefing as an ingestible briefing.md file to initiate the operator-initiated briefing path. This drives the autonomous build pipeline, ensuring phase references can accurately bind libraries and enforce complete coverage.

When should I not use a fixed 9-gate pipeline for website construction?

Avoid a fixed 9-gate pipeline for website construction when your project requires flexible, non-deterministic build steps or lacks a comprehensive configurator briefing, as the pipeline strictly enforces 100% briefing-coverage and sequential phase checkpoints.