building-services

Plan, size, and integrate building MEP systems with a rule-based framework.

139|108|Updated Apr 16, 2026
One-click install
npx skills add https://github.com/h30190/HJPLUS_Taiwan_Architect_KB --skill building-services-h30190
Or copy as Structured Prompt for Agent
Please help me install this Agent Skill.
Skill: building-services
Source: https://github.com/h30190/HJPLUS_Taiwan_Architect_KB/tree/main/raw/%E5%B0%88%E6%A5%AD%E8%A4%87%E5%A7%94%E8%A8%97/%E6%A9%9F%E9%9B%BB%E7%B3%BB%E7%B5%B1/building-services
Command: npx skills add https://github.com/h30190/HJPLUS_Taiwan_Architect_KB --skill building-services-h30190

SYSTEM DOCUMENTATION & REQUIREMENTS

What problem does it solve?

This skill provides a structured approach for designing and integrating building MEP systems, reducing coordination gaps and design errors across HVAC, plumbing, electrical, and fire protection.

Core Features & Use Cases

  • Calculate and validate HVAC loads, sizing ducts and equipment spaces.
  • Coordinate plumbing, electrical, and control systems within a unified design framework.
  • Use Case: A mid-size campus building uses this skill to align HVAC segmentation, riser layouts, and fire-protection zoning in the early schematic design.

Quick Start

Provide building type, floor area, and design goals to initialize an MEP design session.

Frequently Asked Questions about building-services

High-intent search queries and answers about installing and using this skill.

FAQPage Schema
How do I calculate HVAC loads and size ducts for a building design?

Calculate HVAC loads and size ducts by providing building type and floor area to initialize an MEP design session. The framework validates load calculations and equipment space planning to ensure efficient operation and code compliance.

Can I integrate plumbing, electrical, and fire protection systems in one MEP workflow?

Integrate plumbing, electrical, and fire protection systems within a unified MEP design framework. This coordination aligns riser layouts and zoning across disciplines to reduce design errors and coordination gaps.

Does this MEP system design tool support Taiwan-specific building codes?

MEP system design enforces Taiwan-specific regulatory notes while referencing established standards. It ensures code compliance for HVAC, plumbing, electrical, and fire protection systems throughout the design process.

What is the best way to plan MEP equipment spaces during early schematic design?

Plan MEP equipment spaces using a rule-based framework that supports early concept to detailed design. Input design goals and floor area to validate space planning and system interfaces efficiently.

Can I use this framework for HVAC segmentation on a large campus building?

Use this framework for large campus buildings to align HVAC segmentation, riser layouts, and fire-protection zoning. It scales from small offices to large campuses for comprehensive MEP integration.

Why do MEP system interfaces need coordination across HVAC and smart controls?

MEP system interfaces need coordination to align HVAC, plumbing, electrical, and smart controls within a unified design. This structured approach reduces coordination gaps and ensures efficient building operation.