devrel-content-calendar

Plans a quarter of developer-relations content as a dated slot plan with owners and reviewers.

2|Updated Sep 6, 2026
One-click install
npx skills add https://github.com/samber/developer-relations-skills --skill devrel-content-calendar-samber
Or copy as Structured Prompt for Agent
Please help me install this Agent Skill.
Skill: devrel-content-calendar
Source: https://github.com/samber/developer-relations-skills/tree/main/skills/devrel-content-calendar
Command: npx skills add https://github.com/samber/developer-relations-skills --skill devrel-content-calendar-samber

SYSTEM DOCUMENTATION & REQUIREMENTS

💡 This Skill includes references (resource) components.

What problem does it solve? Developer content plans fail on uncounted review capacity and unowned slots, not on lack of ideas. This Skill turns fixed dates, topic ideas, and limited reviewer time into a dated quarterly calendar the team can actually ship. ## Core Features & Use Cases - Quarter shape selection: Presents and ranks evergreen-compounding, launch-dominated, and event-led quarter shapes against capacity, visibility, and compliance costs before any dates are placed. - Capacity sizing in passes: Estimates each format in research, drafting, code, review, and publishing passes, treating reviewer availability as the binding constraint. - Slot plan with validation: Produces a slot table with owner, reviewer, surface, pillar, journey stage, shelf life, and evidence per piece, then checks it against pass thresholds such as the 80% committed-capacity cap. - Use Case: A two-person devrel team with one engineer reviewing four hours a week asks what it can ship next quarter around a v2.0 launch and two conferences; the Skill sizes capacity first, places anchor preparation and follow-up slots, and shows what was cut. ## Quick Start Ask the assistant to plan your next quarter of developer content, naming your fixed release dates, team size, and available reviewer hours.

Frequently Asked Questions about devrel-content-calendar

High-intent search queries and answers about installing and using this skill.

FAQPage Schema
How do I plan a quarterly content calendar for a developer audience?

Start by listing fixed anchors such as releases and CFP deadlines, then size capacity in review passes rather than writing hours. Place anchor-bound pieces first with preparation and follow-up slots, then evergreen slots, keeping committed work under 80 percent of capacity.

How many blog posts can a small devrel team ship per month?

The one published figure puts a developer advocate at one to two substantial posts per month before any content pipeline exists. Use it to challenge optimistic estimates, not as a cap, and replace it with your team's own last-quarter shipped numbers.

How do I balance evergreen content against launch-tied content?

Default to an evergreen majority because those pieces keep earning search traffic after the release, but promote a launch-dominated quarter when a visible date like a board review depends on it. Keep some slots independent of the launch date so a slip does not take the quarter with it.

Why does nothing ship in the last month of the quarter?

The usual cause is capacity counted in drafting time only, ignoring review, code verification, and publishing passes. Re-estimate each format in passes, name a reviewer per slot, and cut slots rather than lowering quality.

Can this skill write the individual blog posts or tutorials in the plan?

No, it plans the quarter only and deliberately stops at the slot level. Producing individual pieces belongs to per-format skills such as engineering-blog-post, which the calendar references for each scheduled slot.

How far ahead should I book an agency or freelance writer?

The one published measurement puts outside writing at eight to nine weeks from conception to publication, plus roughly six months of director time to set the pipeline up. Keep date-bound pieces like launch posts in-house and give agencies undated work.