gao-cost

Answers program cost estimating questions using the GAO Cost Estimating and Assessment Guide.

5|1|Updated Jun 19, 2026
One-click install
npx skills add https://github.com/jgsystemsconsulting/jgs-se-knowledge-packs --skill gao-cost-jgsystemsconsulting
Or copy as Structured Prompt for Agent▼
Please help me install this Agent Skill.
Skill: gao-cost
Source: https://github.com/jgsystemsconsulting/jgs-se-knowledge-packs/tree/main/packs/gao-cost
Command: npx skills add https://github.com/jgsystemsconsulting/jgs-se-knowledge-packs --skill gao-cost-jgsystemsconsulting

SYSTEM DOCUMENTATION & REQUIREMENTS

💡 This Skill includes references (resource) components.

What problem does it solve? Systems engineers and program analysts need authoritative cost estimating guidance mid-task but cannot recall the details of the 462-page GAO Cost Estimating and Assessment Guide (GAO-20-195G). This Skill loads reconstructed reference notes so an agent can answer questions about building, documenting, and auditing reliable program cost estimates. ## Core Features & Use Cases - Reliability Frameworks: Explains the four characteristics of a reliable estimate (comprehensive, well documented, accurate, credible), the 18 best practices, and the 12-step cost estimating process. - Methods and Risk Analysis: Covers analogy, parametric, and engineering build-up methods, learning curves, sensitivity analysis, Monte Carlo risk/uncertainty simulation, confidence levels, and contingency sizing. - EVM and Auditing: Details earned value management (EIA-748, BCWS/BCWP/ACWP, CPI/SPI/TCPI, EAC, PMB, IBR) and how to audit an estimate against GAO criteria, plus specialized topics like software cost estimating and Analysis of Alternatives. - Use Case: Ask how to turn a point estimate into a risk-adjusted budget, and the agent reads the risk/uncertainty chapter to explain Monte Carlo simulation, S curves, and contingency sizing. ## Quick Start Ask the agent to explain the 12-step cost estimating process and which estimating method fits an early-stage program using the gao-cost skill.

Frequently Asked Questions about gao-cost

High-intent search queries and answers about installing and using this skill.

FAQPage Schema
How do I build a reliable program cost estimate?▼

Follow GAO's 12-step process: define purpose, plan, establish a technical baseline and WBS, set ground rules, collect data, develop a point estimate, then run sensitivity and risk analysis before documenting and presenting. A reliable estimate must be comprehensive, well documented, accurate, and credible.

Which cost estimating method should I use for my program?▼

Choose by program maturity and data availability. Use analogy early when a similar system exists, parametric when you have cost drivers and historical data but no detailed design, and engineering build-up for mature designs where bottom-up accuracy matters most.

How do I convert a point estimate into a risk-adjusted budget?▼

Run sensitivity analysis to rank key drivers, then apply three-point or risk-driver inputs through Monte Carlo simulation to produce a cost distribution. Read a confidence level off the S curve and size contingency as the gap above the point estimate.

Does this guide cover schedule risk analysis?▼

No, schedule estimating and schedule risk analysis are deliberately delegated to the companion GAO Schedule Assessment Guide (GAO-16-89G). This pack focuses on cost estimating, cost risk, and earned value management.

What EVM metrics does the guide explain?▼

It covers the three core measures BCWS, BCWP, and ACWP, plus derived indexes CPI, SPI, and TCPI, EAC forecasting, the performance measurement baseline, integrated baseline reviews, and EIA-748's 32 system guidelines.

What are the limitations of this cost estimating reference?▼

It paraphrases rather than reproduces referenced standards like EIA-748, MIL-STD-881D, and the Green Book, and omits embedded source figures and tables. It reflects US federal acquisition best practice, not binding regulation.