ip-uspto-provisional

Draft USPTO provisional patent applications with §112(a) enablement-depth disclosure.

1|Updated Nov 2, 2025
One-click install
npx skills add https://github.com/rjwalters/bucket-brigade --skill ip-uspto-provisional
Or copy as Structured Prompt for Agent
Please help me install this Agent Skill.
Skill: ip-uspto-provisional
Source: https://github.com/rjwalters/bucket-brigade/tree/main/.anvil/skills/ip-uspto-provisional
Command: npx skills add https://github.com/rjwalters/bucket-brigade --skill ip-uspto-provisional

SYSTEM DOCUMENTATION & REQUIREMENTS

What problem does it solve?

This Skill solves the critical problem of provisional patent applications that name inventive features without enabling them at §112(a) depth, causing priority dates to silently fail to attach during later non-provisional conversion. It enforces a disclosure-first workflow that ensures every named feature is enabled with make-and-use detail before filing.

Core Features & Use Cases

  • Enablement-depth-first drafting: Produces provisional specifications that prioritize written-description-and-enablement depth over claim formality, ensuring §119(e) priority attaches to every disclosed feature, embodiment, and range.
  • Multi-critic review pipeline: Runs parallel critics for §112(a) enablement, prior-art positioning, and specification completeness, aggregating scores against a 9-dimension /45 rubric with a ≥39 advance threshold and critical-flag short-circuiting.
  • Conversion-ready finalization: Assembles a COUNSEL-READY filing package with specification, drawings, provisional SB/16 cover-sheet placeholder, and counsel memo, while writing the machine-readable filing record that drives the anvil:ip-uspto non-provisional conversion.

Quick Start

Use the ip-uspto-provisional skill to take an inventor brief through drafting, multi-critic review, revision, audit, and finalization into a COUNSEL-READY provisional patent filing package with enablement-depth scoring and mechanical conversion linkage to the anvil:ip-uspto non-provisional skill.

Frequently Asked Questions about ip-uspto-provisional

High-intent search queries and answers about installing and using this skill.

FAQPage Schema
How do I draft a provisional patent application with enough enablement depth for USPTO priority?

Provisional patent applications require §112(a) enablement-depth disclosure rather than thin claim-centric drafting to attach priority dates under §119(e). Enforcing make-and-use detail for every named feature prevents priority dates from silently failing during later non-provisional conversion.

Why does a provisional patent application fail to attach a priority date during non-provisional conversion?

Priority dates silently fail during non-provisional conversion when provisional specifications name inventive features without enabling them at §112(a) depth. Thin claim-centric drafting without make-and-use detail causes the USPTO to reject priority claims for those features under §119(e).

What is the process for reviewing a provisional patent specification against enablement requirements?

Multi-critic review runs parallel evaluations for §112(a) enablement, prior-art positioning, and specification completeness, aggregating scores against a 9-dimension /45 rubric with a ≥39 advance threshold and critical-flag short-circuiting to ensure provisional patent specifications meet enablement requirements.

What should be included in a counsel-ready provisional patent filing package?

A counsel-ready provisional patent filing package assembles the enablement-depth specification, drawings, provisional SB/16 cover-sheet placeholder, and counsel memo. It writes a machine-readable filing record that surfaces the 12-month conversion deadline and drives non-provisional conversion.

Can I file a provisional patent application without formal claims?

Yes, this approach supports a claims-optional, enablement-dominant artifact class for provisional patent applications. Prioritizing written-description and enablement depth over claim formality ensures §119(e) priority attaches to every disclosed feature, embodiment, and range for later conversion.

When do I need to convert a provisional patent application to a non-provisional?

A 12-month conversion deadline surfacing mechanism tracks when you need to convert a provisional patent application to a non-provisional. The machine-readable filing record drives this conversion linkage to ensure priority dates are preserved under §119(e).