Analyze plan revisions to detect engineering changes and output BOM/ECIR impact reports.

Updated Aug 23, 2026
One-click install
npx skills add https://github.com/CBoser/ConstructionPlatform --skill plan-change-analyzer
Or copy as Structured Prompt for Agent
Please help me install this Agent Skill.
Skill: plan-change-analyzer
Source: https://github.com/CBoser/ConstructionPlatform/tree/main/docs/archive/skills/claude_skills/ECIR_Processing/plan-change-analyzer/plan-change-analyzer
Command: npx skills add https://github.com/CBoser/ConstructionPlatform --skill plan-change-analyzer

SYSTEM DOCUMENTATION & REQUIREMENTS

💡 This Skill includes references (resource) components.

What problem does it solve?

Plan Change Analyzer identifies engineering changes between plan revisions and links them to BOM and ECIR impacts.

Core Features & Use Cases

  • Analyze beam schedules, hardware schedules, and shear wall data to detect dimension, spec, and quantity changes.
  • Produce a structured change report with sheet references, and a material list to feed BOM/ECIR updates.
  • Use cases include Pre-Takeoff Review, ECIR Verification, and Estimator Training for plan-to-cost relationships.

Quick Start

Upload BEFORE and AFTER plan PDFs, specify focus sheets, run analysis, review the generated report, and update BOM/ECIR items accordingly.

Frequently Asked Questions about plan-change-analyzer

High-intent search queries and answers about installing and using this skill.

FAQPage Schema
How do I identify changes between plan revisions for BOM and ECIR updates?

Plan Change Analyzer compares BEFORE and AFTER plan PDFs to detect dimension, spec, and quantity changes in beam schedules, hardware schedules, and shear wall data. It produces a structured change report with sheet references and a material list to feed directly into BOM and ECIR updates.

What does a plan change analysis report include?

The report identifies engineering changes with sheet references, lists affected materials, and highlights framing and hardware modifications. This structured output maps changes to specific plan pages and supplies the material updates needed for cost and estimation verification.

Can I use plan change analysis for pre-takeoff review and estimator training?

Yes. Plan Change Analyzer applies to pre-takeoff reviews, ECIR verification, and estimator training across plan sets of 20–30 pages. It helps teams understand plan-to-cost relationships by linking engineering changes to material and cost impacts.

What data do I need to upload to run a plan change analysis?

Upload BEFORE and AFTER plan PDFs, specify which sheets to focus on, then run the analysis. The Skill reads beam schedules, hardware schedules, and shear wall data to detect and report all changes between revisions.

How does plan change analysis help with ECIR verification?

By identifying all engineering changes and linking them to material impacts, the Skill ensures ECIR requests align with actual plan modifications. The structured change report and material list provide the evidence needed to verify and process change orders accurately.