planner_workflow

Organize pre-regression planning with Idea–Data Alignment and Baseline Design lock.

Updated Apr 15, 2026
One-click install
npx skills add https://github.com/sheehe/coase --skill planner-workflow
Or copy as Structured Prompt for Agent
Please help me install this Agent Skill.
Skill: planner_workflow
Source: https://github.com/sheehe/coase/tree/main/resources/plugins/coase-builtin/skills/planner_workflow
Command: npx skills add https://github.com/sheehe/coase --skill planner-workflow

SYSTEM DOCUMENTATION & REQUIREMENTS

What problem does it solve?

本 Skill 负责在任何回归分析前,帮助研究团队完成 Idea–Data Alignment 与 Baseline Research Proposal & Design 的锁定,从而确保分析可跑、可解释、可审查。

Core Features & Use Cases

  • Idea–Data Alignment:对齐研究问题、数据集、变量定义与研究设计,确保数据与分析目标的一致性。
  • Baseline Design Lock:生成可执行的基线方程、核心设计要素与识别策略,提供执行前的唯一输入。
  • 研究质量门槛:提供 Phase 4 质量门槛框架,确保后续执行阶段具备可追溯性与可审查性。
  • 迭代回溯支持:在 Phase 4 内跟踪迭代过程与改动记录,确保改动可追溯。

Quick Start

请提交阶段性规划草案,明确数据对齐、文献空白与基线设计,以便进入执行阶段。

Frequently Asked Questions about planner_workflow

High-intent search queries and answers about installing and using this skill.

FAQPage Schema
How do I lock a baseline design before running empirical regression analysis?

Idea–Data Alignment ensures runnable empirical analyses by aligning research questions, datasets, and variable definitions with the research design before execution, guaranteeing data and analysis objective consistency.

How do I ensure my research design is auditable and traceable before execution?

You ensure research design auditability by applying a Phase 4 quality gate framework that tracks iteration processes and modification records, making all subsequent empirical analyses traceable and reviewable.

What is the best way to align research ideas with available datasets for experimental design?

Baseline Design Lock generates an executable baseline equation, core design elements, and identification strategies, serving as the sole input before execution to ensure the analysis is runnable and interpretable.

Can I track iteration changes during the baseline design phase?

Yes, you can track iteration changes during baseline design using the Phase 4 iteration backtracking support, which records modifications to ensure all design alterations remain fully traceable for review.

Do I need a literature gap analysis to start planning my empirical analysis?

Yes, you need a literature gap analysis to start planning because the skill requires submitting a phased planning draft that explicitly defines data alignment, literature gaps, and baseline design before execution.