pre-construction-information

Compile CDM 2015 Pre-Construction Information packs with gap registers.

1|Updated Jun 14, 2026
One-click install
npx skills add https://github.com/ashley-eyekyam/hse-leadership-skills --skill pre-construction-information
Or copy as Structured Prompt for Agent
Please help me install this Agent Skill.
Skill: pre-construction-information
Source: https://github.com/ashley-eyekyam/hse-leadership-skills/tree/main/skills/pre-construction-information
Command: npx skills add https://github.com/ashley-eyekyam/hse-leadership-skills --skill pre-construction-information

SYSTEM DOCUMENTATION & REQUIREMENTS

💡 This Skill includes scripts (resource) and references (resource) and assets (resource) components.

What problem does it solve?

Generic AI prompting produces generic safety paperwork that regulators reject: vague tasks, controls that collapse to PPE, actions with no owner, and personal data leaking into widely shared documents. This skill produces consultant-grade Pre-Construction Information packs that are site-specific, hierarchy-of-controls-driven, and de-identified, ensuring defensibility and regulatory compliance under CDM 2015.

Core Features & Use Cases

  • Gap Discipline: Every missing existing-structure source (asbestos survey, ground investigation, as-builts) is recorded as a documented [GAP] with a named owner and due date, never silently omitted.
  • Regulatory Compliance: Automatically grounds the output in CDM 2015 Regulation 4 and HSE L153 Appendix 1, stating the client's duty and timing to avoid citation hard-fails.
  • De-identification: Scrubs survey-occupier names and health details to role labels before drafting, with restricted-distribution flags for sensitive site information.
  • Use Case: A safety manager needs to compile the PCI for a brownfield refurbishment project but lacks an asbestos survey and ground investigation. The skill elicits the gaps, assigns owners and dates, and produces a branded report that feeds directly into the Construction Phase Plan.

Quick Start

Use the pre-construction-information skill to compile the Pre-Construction Information pack for the Tower B brownfield refurbishment project, noting that the asbestos survey and ground investigation are outstanding gaps owned by the client.

Frequently Asked Questions about pre-construction-information

High-intent search queries and answers about installing and using this skill.

FAQPage Schema
How do I compile pre-construction information for a brownfield site under CDM 2015?

Pre-construction information for a brownfield site under CDM 2015 is compiled by assembling existing-structure hazards, site surroundings, and an information-gaps register into a structured report. This ensures regulatory compliance and feeds directly into the Construction Phase Plan.

What is gap discipline in construction safety reporting?

Gap discipline in construction safety reporting ensures every missing pre-construction source, like an asbestos survey or ground investigation, is recorded as a documented gap with a named owner and due date. It prevents missing information from being silently omitted from regulatory packs.

How do I de-identify sensitive data in a pre-construction information pack?

To de-identify sensitive data in a pre-construction information pack, survey-occupier names and health details are scrubbed and replaced with role labels before drafting. Restricted-distribution flags are also applied to sensitive site information to ensure compliance.

Can I use AI to draft a CDM 2015 pre-construction information pack without missing regulatory citations?

Drafting a CDM 2015 pre-construction information pack requires grounding the output in Regulation 4 and HSE L153 Appendix 1 to avoid citation hard-fails. Structured intake and mandatory SME review before output ensure regulatory citation accuracy and defensibility.

Does pre-construction information generation work for greenfield development projects?

Pre-construction information generation applies to both brownfield and greenfield sites. It elicits project-specific hazards and missing source documents, assigning owners and dates to any gaps to produce a compliant safety report tailored to the site context.

What are the limitations of generic AI prompting for construction safety paperwork?

Generic AI prompting for construction safety paperwork produces vague tasks, controls that collapse to PPE, and actions with no owner. It lacks the hierarchy-of-controls-driven approach and structured validation required to prevent personal data leaks and regulatory rejection.