qa-phase4

Validate Phase 3 completion, coordinate sign-off, and generate an HTML report with evidence.

9|3|Updated Apr 14, 2026
One-click install
npx skills add https://github.com/Pythagora-io/agent-templates --skill qa-phase4
Or copy as Structured Prompt for Agent
Please help me install this Agent Skill.
Skill: qa-phase4
Source: https://github.com/Pythagora-io/agent-templates/tree/main/QA%20Agent/qa-phase4
Command: npx skills add https://github.com/Pythagora-io/agent-templates --skill qa-phase4

SYSTEM DOCUMENTATION & REQUIREMENTS

💡 This Skill includes references (resource) components.

What problem does it solve?

Phase 4 verifies testing is complete, posts results to Linear/GitHub/Slack, gets Tech Lead sign-off, THEN generate the final HTML report with screenshot evidence, upload to S3, update knowledge base, and close out the queue.

Core Features & Use Cases

  • Verify that Phase 3 is complete — all tests have results and evidence.
  • Post concise QA summaries to Linear and GitHub, then wait for sign-off before generating final HTML report.
  • Build and publish the final HTML report with screenshots to S3 and update the knowledge base.

Quick Start

Initiate Phase 4 by confirming Phase 3 completion and requesting Tech Lead sign-off before building the final report.

Frequently Asked Questions about qa-phase4

High-intent search queries and answers about installing and using this skill.

FAQPage Schema
How do I finalize a QA cycle and get Tech Lead sign-off after testing is complete?

Finalize a QA cycle by verifying Phase 3 completion, posting QA summaries to Linear, GitHub, and Slack, and gating report generation on Tech Lead sign-off before delivering the final results.

Can I generate a final QA report before getting Tech Lead sign-off?

You cannot generate the final QA report before sign-off. The workflow requires posting QA summaries to Slack, Linear, and GitHub, then explicitly waiting for Tech Lead sign-off to gate the final HTML report generation.

What steps are required to update a knowledge base after a QA cycle ends?

Update a knowledge base after a QA cycle by verifying Phase 3 completion, securing Tech Lead sign-off, generating the final HTML report with evidence, uploading it to S3, and executing the knowledge base update and queue transition.

Does the QA sign-off process require posting results to external systems?

The QA sign-off process requires posting concise QA summaries to Linear, GitHub, and Slack. This external posting is mandatory before the Tech Lead can provide the sign-off needed to generate the final report.

Why would QA Phase 4 fail to generate a final report?

QA Phase 4 fails to generate a final report if Phase 3 completion cannot be validated, or if the required Tech Lead sign-off is missing, as these steps strictly gate the final HTML report generation and S3 upload.