requirement-elicitation

Collect requirement evidence with traceability, confidence scoring, and contradiction visibility.

7|Updated Feb 14, 2026
One-click install
npx skills add https://github.com/KentoShimizu/sw-agent-skills --skill requirement-elicitation-kentoshimizu
Or copy as Structured Prompt for Agent
Please help me install this Agent Skill.
Skill: requirement-elicitation
Source: https://github.com/KentoShimizu/sw-agent-skills/tree/main/skills/requirement-elicitation
Command: npx skills add https://github.com/KentoShimizu/sw-agent-skills --skill requirement-elicitation-kentoshimizu

SYSTEM DOCUMENTATION & REQUIREMENTS

💡 This Skill includes assets (resource) and references (resource) components.

What problem does it solve?

Requirement elicitation workflow to collect requirement evidence with traceability, confidence, and contradiction visibility to improve baseline quality.

Core Features & Use Cases

  • Evidence intake templates and assets to capture stakeholder inputs.
  • Reference rules and backlogs to ensure confidence and surface gaps.
  • Deliverables include structured evidence sets, clarification question backlogs, and seeds for baseline synthesis.
  • Use Case: When project requirements are incomplete or contested, run an elicitation to gather sources and confirm assumptions before drafting canonical requirements.

Quick Start

Populate the evidence intake template and reference the evidence-strength rules to begin the elicitation process.

Frequently Asked Questions about requirement-elicitation

High-intent search queries and answers about installing and using this skill.

FAQPage Schema
What is requirement elicitation and when do I need it?

Requirement elicitation is the process of collecting stakeholder inputs to establish high-confidence baselines. You need it when project requirements are incomplete or contested, requiring structured evidence gathering and contradiction visibility before drafting canonical specifications.

How do I collect stakeholder requirements with traceability?

You collect stakeholder requirements with traceability by populating evidence intake templates and applying reference rules to separate inputs. This structured workflow captures sources, scores confidence levels, and generates a clarification backlog to resolve gaps.

How do I manage contradictions in contested project requirements?

You manage contradictions in contested project requirements by mapping stakeholders and gathering evidence into structured sets. The workflow applies confidence scoring and contradiction visibility to surface conflicts and assign clear decision ownership for resolution.

Can I use this workflow for incomplete project requirements?

You can use this workflow for incomplete project requirements because it is specifically designed to apply when inputs are missing. It generates a clarification question backlog to systematically identify gaps and confirm assumptions before baseline synthesis.

What is the best way to establish a high-confidence requirements baseline?

The best way to establish a high-confidence requirements baseline is to run a repeatable elicitation workflow that separates evidence, scores confidence, and tracks traceability. This produces structured evidence sets and decision ownership seeds for canonical requirement drafting.

Why does requirement elicitation need evidence separation and confidence scoring?

Requirement elicitation needs evidence separation and confidence scoring to ensure baseline quality and transparency. Separating evidence prevents unverified assumptions from contaminating the baseline, while scoring highlights low-confidence areas requiring further stakeholder clarification.