senior-electrical-engineer

Provides electrical engineering consulting for power systems, solar PV, and NEC/RETIE compliance.

Updated Mar 29, 2026
One-click install
npx skills add https://github.com/carmons6013-dotcom/Carmons --skill senior-electrical-engineer-carmons6013-dotcom
Or copy as Structured Prompt for Agent
Please help me install this Agent Skill.
Skill: senior-electrical-engineer
Source: https://github.com/carmons6013-dotcom/Carmons/tree/main/skills/senior-electrical-engineer
Command: npx skills add https://github.com/carmons6013-dotcom/Carmons --skill senior-electrical-engineer-carmons6013-dotcom

SYSTEM DOCUMENTATION & REQUIREMENTS

💡 This Skill includes references (resource) components.

What problem does it solve? Electrical engineering projects require navigating complex regulatory frameworks (NEC in the US, RETIE 2024 in Colombia), performing accurate system sizing calculations, and producing professional documentation. This Skill provides expert-level guidance across power systems, solar PV, EV infrastructure, data centers, and industrial automation without needing to consult multiple references. ## Core Features & Use Cases - Dual-Market Compliance Guidance: Cites specific NEC articles for US projects and RETIE 2024 chapters for Colombian projects, including RETILAB certification and ONAC inspection requirements. - System Design & Calculations: Covers PV sizing, generator sizing, conductor ampacity, voltage drop, short circuit analysis, arc flash (IEEE 1584), protection coordination, and power quality (IEEE 519). - Economic Analysis: Quantifies IRA 2022 tax incentives (ITC, bonuses, PWA requirements) for US projects and Ley 1715 benefits for Colombia, with TCO/ROI/NPV templates. - Use Case: A user planning a 300 kW commercial solar installation in Bogotá can get array sizing with altitude derating, RETIE 2024 Art. 19 compliance steps, CREG 030/2018 net metering guidance, and a payback analysis with Ley 1715 incentives in one response. ## Quick Start Ask the assistant to design a solar PV system with battery backup for a commercial facility in Colombia, including RETIE 2024 compliance and an ROI analysis.

Frequently Asked Questions about senior-electrical-engineer

High-intent search queries and answers about installing and using this skill.

FAQPage Schema
How do I size a commercial solar PV system for NEC or RETIE compliance?

Size the array using annual kWh divided by peak sun hours and system efficiency (78-82%), then apply NEC Art. 690 requirements in the US or RETIE 2024 Art. 19 in Colombia. The Skill includes a full PV design checklist covering conductor sizing, rapid shutdown, grounding, and interconnection steps for both markets.

What is the difference between NEC and RETIE 2024 compliance?

NEC (NFPA 70) is the legally binding electrical code in the US, while RETIE 2024 (Resolución MINMINAS 40117) is mandatory in Colombia. They differ in voltage levels, grounding design, inspection authority (AHJ vs ONAC-accredited inspectors), and product certification requirements.

How do I calculate IRA 2022 tax credits for a solar project?

The base Investment Tax Credit is 30%, with bonuses up to 50% for domestic content, energy communities, and low-income locations. Projects over 1 MW must meet prevailing wage and apprenticeship requirements to receive the full rate; otherwise the credit drops to 6%.

Does RETIE 2024 cover EV charging and battery storage?

Yes, RETIE 2024 added Art. 38 for electric vehicle charging infrastructure (EVSE) and Art. 40 for battery energy storage systems (BESS). These cover charger requirements, bidirectional metering for V2G, fire protection, and disconnecting means.

When should I use IEEE 1584 for arc flash analysis?

Use IEEE 1584-2018 whenever working on or near energized equipment, in both US and Colombian markets. The calculation requires available fault current, working distance, and protective device clearing time to determine incident energy and required PPE category.

What are the limitations of this electrical engineering guidance?

The Skill provides engineering guidance and typical cost ranges but does not replace stamped drawings from a licensed PE (US) or an Ingeniero Electricista Matriculado (Colombia). Final designs still require AHJ or ONAC inspection and site-specific utility coordination.