timeline-estimation

Community

Accurate timelines via three-point estimates.

AuthorSSiertsema
Version1.0.0
Installs0

System Documentation

What problem does it solve?

Estimating realistic project timelines is challenging when inputs are uncertain, teams vary in capacity, and dependencies complicate schedules. This skill provides structured, multi-scenario end-dates (optimistic, most-likely, pessimistic) using three-point (PERT), analogous, parametric, and velocity-based methods, producing a clear milestone plan and an actionable critical path.

Core Features & Use Cases

  • Three-point / PERT estimates: compute optimistic, most-likely, and pessimistic durations for each work item and the overall timeline.
  • Dependency-mapping integration: determine the critical path when dependencies exist and respect calendar constraints.
  • Diagrams and milestones: generate Mermaid Gantt and timeline diagrams, plus a milestone plan with entry criteria.
  • Output end-date ranges: provide clean O/M/P end-date ranges for communication and risk assessment.

Quick Start

Provide the subject and at least five work items to generate optimistic, most-likely, and pessimistic timelines.

Dependency Matrix

Required Modules

None required

Components

Standard package

💻 Claude Code Installation

Recommended: Let Claude install automatically. Simply copy and paste the text below to Claude Code.

Please help me install this Skill:
Name: timeline-estimation
Download link: https://github.com/SSiertsema/claude-code-plugins/archive/main.zip#timeline-estimation

Please download this .zip file, extract it, and install it in the .claude/skills/ directory.
View Source Repository

Agent Skills Search Helper

Install a tiny helper to your Agent, search and equip skill from 471,000+ vetted skills library on demand.