power-management
CommunityDesign robust power distribution for ROS 2 robots.
Authorwimblerobotics
Version1.0.0
Installs0
System Documentation
What problem does it solve?
Power distribution design for mobile robots, including sizing batteries, planning voltage rails, and monitoring rails to ensure reliable operation and safety.
Core Features & Use Cases
- Multi-rail power topology design from battery to subsystems (12V, 5V, 3.3V rails)
- Battery sizing calculation and runtime estimation, including safety margins
- Power monitoring strategy using INA219/INA226 and ROS 2 diagnostics
- Safety and emergency cutoff planning, including wiring, fusing, and protections
- Practical guidelines for thermal management and component selection
Quick Start
Describe a full power distribution plan for a mobile robot, including battery sizing and rail regulation, in plain language.
Dependency Matrix
Required Modules
None requiredComponents
Standard package💻 Claude Code Installation
Recommended: Let Claude install automatically. Simply copy and paste the text below to Claude Code.
Please help me install this Skill: Name: power-management Download link: https://github.com/wimblerobotics/ros2-copilot-skills/archive/main.zip#power-management Please download this .zip file, extract it, and install it in the .claude/skills/ directory.
Agent Skills Search Helper
Install a tiny helper to your Agent, search and equip skill from 471,000+ vetted skills library on demand.