rtl-p5-verify-policy

Community

Enforce Phase-5 RTL verification gates.

Authorbabyworm
Version1.0.0
Installs0

System Documentation

What problem does it solve?

Phase 5 verification governance for RTL designs, defining module graduation gates, coverage targets, and synthesis estimation rules to standardize verification effort and timelines.

Core Features & Use Cases

  • Defines a three-stage Phase 5 verification architecture (Stage 1: per-module checks, Stage 2: top-level integration, Stage 3: final compliance) to streamline risk management and scheduling.
  • Specifies concrete graduation gates for V1 through V9 checks, including lint, formal verification, CDC, protocol, functional regression, coverage, performance, synthesis estimation, and code review.
  • Guides continuous improvement with defect feedback loops, escalation paths, and traceability artifacts to support audit-ready verification.

Quick Start

Follow this policy to align your module verification plan with Phase 5 gates and targets.

Dependency Matrix

Required Modules

None required

Components

Standard package

💻 Claude Code Installation

Recommended: Let Claude install automatically. Simply copy and paste the text below to Claude Code.

Please help me install this Skill:
Name: rtl-p5-verify-policy
Download link: https://github.com/babyworm/rtl-agent-team/archive/main.zip#rtl-p5-verify-policy

Please download this .zip file, extract it, and install it in the .claude/skills/ directory.
View Source Repository

Agent Skills Search Helper

Install a tiny helper to your Agent, search and equip skill from 471,000+ vetted skills library on demand.