rtl-p5b-silicon-validation
CommunityOrchestrate Phase 5B silicon validation end-to-end
Authorbabyworm
Version1.0.0
Installs0
System Documentation
What problem does it solve?
Phase 5B silicon validation is critical to ensure RTL designs meet timing, synthesis readiness, and top-level integration requirements before tape-out. This skill automates the silicon-readiness validation process, reducing manual verification effort and tightening signoff gates.
Core Features & Use Cases
- Orchestrates Phase 5B silicon validation for RTL blocks and top integration, coordinating synthesis, constraints, and timing checks.
- Enforces signoff-oriented gates and precise top-integration checks after functional closure, replacing ad-hoc verification steps.
- Use Case: A design team transitions from Phase 5A to 5B can apply this skill to ensure a smooth, auditable silicon-validation flow across blocks and top-level integration.
Quick Start
Invoke the silicon validation orchestrator with an optional --top <name> parameter to validate a specific block.
Dependency Matrix
Required Modules
None requiredComponents
Standard package💻 Claude Code Installation
Recommended: Let Claude install automatically. Simply copy and paste the text below to Claude Code.
Please help me install this Skill: Name: rtl-p5b-silicon-validation Download link: https://github.com/babyworm/rtl-agent-team/archive/main.zip#rtl-p5b-silicon-validation Please download this .zip file, extract it, and install it in the .claude/skills/ directory.
Agent Skills Search Helper
Install a tiny helper to your Agent, search and equip skill from 471,000+ vetted skills library on demand.