rtl-p5b-silicon-validation

Community

Orchestrate Phase 5B silicon validation end-to-end

Authorbabyworm
Version1.0.0
Installs0

System Documentation

What problem does it solve?

Phase 5B silicon validation is critical to ensure RTL designs meet timing, synthesis readiness, and top-level integration requirements before tape-out. This skill automates the silicon-readiness validation process, reducing manual verification effort and tightening signoff gates.

Core Features & Use Cases

  • Orchestrates Phase 5B silicon validation for RTL blocks and top integration, coordinating synthesis, constraints, and timing checks.
  • Enforces signoff-oriented gates and precise top-integration checks after functional closure, replacing ad-hoc verification steps.
  • Use Case: A design team transitions from Phase 5A to 5B can apply this skill to ensure a smooth, auditable silicon-validation flow across blocks and top-level integration.

Quick Start

Invoke the silicon validation orchestrator with an optional --top <name> parameter to validate a specific block.

Dependency Matrix

Required Modules

None required

Components

Standard package

💻 Claude Code Installation

Recommended: Let Claude install automatically. Simply copy and paste the text below to Claude Code.

Please help me install this Skill:
Name: rtl-p5b-silicon-validation
Download link: https://github.com/babyworm/rtl-agent-team/archive/main.zip#rtl-p5b-silicon-validation

Please download this .zip file, extract it, and install it in the .claude/skills/ directory.
View Source Repository

Agent Skills Search Helper

Install a tiny helper to your Agent, search and equip skill from 471,000+ vetted skills library on demand.